Skip to content

Bounded execution and proof qualification

Repeat a declared host campaign

From the source checkout, run the committed five-cell plan once:

uv run --project bin --locked python benchmarks/execution_campaign.py --output /tmp/anvil-campaign

The default plan is benchmarks/fixtures/execution_campaign.json: 1,000 tasks per cell; relaxed/local with 8, 32 and 128 command executors, strict/local with 8, and relaxed/Git with 8. --plan PATH selects a reviewed JSON plan with the same fields. The plan contains no executable commands or physical-container settings. It is validated in full before reserving a fresh output directory.

The campaign calls the existing supervisor sequentially, with one ledger writer and zero containers per cell. It retains plan.json, campaign.json, every native receipt, and each cell's .work evidence. Existing destinations are refused atomically; retries require a new destination and remain separate observations. Each run records the plan and receipt hashes, source-file hashes, Git HEAD and whether those bytes match that commit. A modified working tree is explicitly identified; its measured bytes must not be attributed to clean HEAD.

The default target is configured in the plan, not a universal skill rule. Each named native stage must have samples and p95 at or below that target. A latency miss remains visible while the other already-declared host cells run. A correctness, source, custody or interruption failure stops the campaign before the next cell. Missing cells cannot qualify. Exit zero requires the whole campaign's correctness and configured latency gates; exit one retains the failed or incomplete results. An invalid plan or existing destination exits two.

Plans have one to eight cells, at most 2,000 tasks and 128 command executors per cell, and at most a one-hour campaign deadline. The existing 256 MiB retained fixture bound applies per cell. The remaining campaign budget bounds each cell's supervised deadline; cleanup and final readback can extend wall time beyond the execution deadline. The campaign never starts or expands OpenShell workers. Physical qualification still uses the separate prior-wave, capacity, identity, latency and cleanup gates described below.

Run one cell

Run the committed-source harness with a fresh receipt destination:

uv run --project bin --locked python benchmarks/execution_scale.py --tasks 1000 --workers 8 --output /tmp/anvil-execution-scale.json

It creates a disposable committed Git repository and native event-sourced State next to the receipt, in anvil-execution-scale.work. Existing receipts and work directories are never overwritten. The harness explicitly selects its own owner registry; it neither reads nor changes the operator's project State.

Finite paced host offers

Declare a separate arrival condition with a fresh output destination:

uv run --project bin --locked python benchmarks/execution_scale.py --tasks 1000 --workers 128 --proof-preparation worker --arrival-rate 80 --output /tmp/anvil-paced.json

--arrival-rate is an integer from 1 to 1,000 offers per second. Omitting it preserves the burst fixture. The option is host-only: executor adapters, the existing campaign plan and OpenShell waves do not acquire a paced mode. The example's 80/s is an offered workload, not a throughput promise or workflow latency target. This finite condition does not replace previous burst failures.

One owned producer schedules offers at epoch + index / arrival_rate while the existing sole coordinator consumes results and appends native evidence. The producer uses frozen task/claim snapshots and never accesses State. Only the producer waits for the schedule. The ledger writer is never paced. All native claims still precede execution; this does not measure concurrent claim creation.

At each actual offer, the producer tries to reserve one of --workers slots without waiting for capacity. A reservation lasts through command/proof work, native append or failed handling, and timing retention. A full cap records capacity_refused; it neither delays that offer nor creates a command or proof. Any refusal fails full-load validation. Submission failure stops further offers, records the remaining tasks as not_offered, and drains already owned work. Producer cancellation is cooperative; its non-daemon thread is joined, with unknown stop treated as failure under the existing outer supervisor.

The optional arrival receipt uses anvil.execution-arrivals.v1. It retains each scheduled and actual offer, reservation, executor-submission call time, admission/disposition and terminal handling time. Existing raw command, proof and ledger timestamps retain their boundaries; queue time starts at the actual offer. Late and catch-up offers keep their real timestamps and gaps. Configured rate and observed rate (offer intervals over first-to-last actual offer) are distinct; a one-offer sample has no observed rate.

Backlog peaks are reconstructed at every raw event. The one-second cumulative series samples at epoch + second, including events at that boundary, through the rounded-up final handling time. Equal timestamps use offered, reserved, started, proof-ready, ledger, terminal order, then task ID. A terminal failure removes that task from backlog but remains in the failure count. In-flight means reserved through terminal handling; waiting-to-start and proof-ready-to-ledger are separate subsets. Drain measures final handling after the producer finishes. Zero final backlog proves only that this finite workload drained. Partial records, missing captures, storage failures or uncertain cleanup cannot pass.

Workload and controls

The fixture creates independent tasks with exact command-proof requirements and claims them through native, scope-bound execution bundles. Cohorts default to 12 members. All member claims exist before execution starts, so a 1,000-task run checks 1,000 simultaneous active member claims. The executor admits at most --workers real command subprocesses; one coordinator records all progress and evidence. This is a qualification harness, not a new product scheduler.

The scale fixture uses empty file and conflict-group scopes. Bundle admission can use the existing task/status index to check only member-task claims in that case: unrelated claims cannot conflict with either empty union. A nonempty file or group union still checks all active claims, including other PRDs and actors, using claim-time file reservations. This optimization does not establish latency for general software tasks with file or group scopes. Semantic conflict and replay tests cover those cases separately from performance measurements.

Each subprocess actually executes a deterministic Python assertion for its assigned task. The harness captures exact command, output bytes, timestamps and exit status, binds the artifact to the native immutable member claim context, and passes it through the existing proof loader/verifier and native evidence event guard. It does not replace a required proof with a successful-looking string. Captures use the explicit claim_owner_self_attested trust mode, not a claim of independent issuer attestation or application correctness.

The final oracle requires exact member custody and evidence counts, every successful task in needs_review, zero accepted tasks, and byte-equivalent canonical State after replay. Failed captures remain on disk and do not become completion evidence. A separate focused regression executes a command that prints a success-looking message but exits nonzero, checks refusal, and proves unrelated members still complete.

Execution authorization and pending review

The scale fixture seeds an exactly approved PRD and admits every cohort before executing commands. Its synthetic actor attribution and self-attested proofs measure execution and proof intake, not human deliberation or final approval throughput. It never records a successful final task acceptance.

tests/test_execution_review_backlog.py exercises the distinct successive-cohort journey through both public CLI and HTTP confirmation. The first cohort submits actual subprocess proofs and remains pending review. A newly planned independent cohort then receives its own exact-scope authorization and submits real proofs while the first cohort stays unaccepted. The test also checks board readback, claim/proof identity and replay, and verifies that premature protected acceptance and a cohort with an unfinished dependency are refused without ledger changes. Pending review therefore does not reserve execution capacity for independent work; a dependency that requires completion still waits for final acceptance. This journey adds no atomic bulk final-acceptance operation and does not treat a local actor string as authenticated human approval.

Measurement boundaries

The receipt separates setup, scope projection, scoped claims, guarded claim append, progress append, executor admission queue, actual command duration, proof-result queue, proof validation, evidence append, command-end-to-durable-evidence latency, bundle readiness and replay. Each stage records p50/p95/p99/max and sample count. Command duration includes interpreter startup and a deliberate 20 ms fixture wait. Queue latency is included in the execution throughput and separately exposed; it is never hidden inside a claim that the whole operation meets 15 ms. claim_append measures the actual native append, including its live checks and reducer. scoped_claim also includes Git identity, immutable member context capture and manager preflight. The 15 ms native-stage gate uses claim_append, progress append, proof validation and evidence append. Full cohort preparation and end-to-end acknowledgement remain separate measured costs; passing the native-stage gate does not mean either is below 15 ms.

The accepted 15 ms p95 objective concerns ledger operations. The historical four fixture gates remain unchanged for compatibility and keep their original scope: proof_validation spans _prepare_proof, including artifact construction, native verification and retention, wherever that work runs. proof_preparation selects coordinator or worker execution; proof_preparation_wait measures command-end to proof-start waiting. No new 15 ms gate applies to arrival, admission, preparation wait, queue, completion or backlog drain, and no numeric workflow SLO is established. Historical misses remain failures against their original gates. This optional fixture adds no physical or real-model qualification.

peak_active_claims, executor limit, observed overlapping command intervals, ledger writers and actual containers are separate fields. This harness reports zero containers. A thousand active claims do not demonstrate a thousand executing containers, a thousand writers, or a real application workload.

Use --durability strict for log fsync and stronger SQLite synchronization; the default relaxed mode has different crash guarantees. --events-storage git is a separate cell because its content-validation cost differs from local event storage. Compare only matched modes, source hashes and fixture sizes.

The CLI requires POSIX process-group signaling capability, limits tasks to 2,000, executor slots to 128, cohorts to 12, each command to 30 seconds, retained fixture storage to 256 MiB, and the overall deadline to at most one hour (15 minutes by default). On timeout it terminates the owned process group and retains a failed receipt and the available ledger/captures. Source hashes are checked before and after the run; changing source cannot produce a validated receipt.

Before spawning any worker, the supervisor probes its own process group with signal zero, which sends no signal. If the platform denies that capability (including restrictive OpenShell environments), the CLI retains a failed unsupported_environment receipt with child_started: false; no worker starts. The native run() API is usable only under an external managed owner's bounded lifecycle, including cancellation and cleanup. It does not supply the CLI's supervision itself. There is no unattended bypass flag or sandbox-policy fallback.

Qualification results

Scale cells must be recorded with the source commit, file hashes, runtime and SQLite versions, event/durability mode, resource limits, workload sizes, exact errors and the retained receipt. No large-scale result is claimed by this guide until those cells have actually run. The initial small harness regression is correctness evidence only. Pi/GLM review and OpenShell execution receipts remain separate from host measurements, browser visual checks and physical-container qualification.

The harness also runs the canonical snapshot through the existing isolated web reader worker, retaining its response and size. That read keeps the default provider limits, 64 MiB scratch-file ceiling, 20-second timeout and 17 MiB output ceiling. Its installed reader source must match the measured source files. The web_snapshot stage measures this full read separately from replay-oracle serialization; a failed read makes the qualification fail rather than lifting a limit. This is provider-read evidence, not a browser rendering test.

Executor adapters may supply prepare_executor(project) after the fixture's Git commit. It returns the exact per-task argv builder used for both the frozen proof requirement and execution; a mismatch is refused. Preparation time is reported separately. Commands preserve the caller's existing HOME and optional XDG_CONFIG_HOME paths for native CLI configuration without copying credentials. The snapshot worker instead receives only an allowlisted environment with local State layout and the explicit fixture path, discarding inherited Anvil context.

The deadline regression uses the public command's minimum ten-second deadline and a real spawned coordinator with a SIGTERM-ignoring command descendant. It requires the coordinator to stop, the descendant to stop executing, and a failed timeout receipt to remain. Escalation targets the entire owned process group even when its leader already exited on SIGTERM. The deadline and interruption regressions explicitly skip when the platform denies process-group capability and retain that reason. The separate refusal regression verifies that denied capability creates no child and remains required in those environments.

OpenShell workers

benchmarks/openshell_execution_scale.py runs the same proof fixture through actual OpenShell sandbox commands on a local Docker gateway. Supply the existing image name and its immutable Docker image ID; use --help for bounded resource options. It does not configure or restart the gateway or attach model providers.

Start with two workers. The supported step sequence is 2, 8, 32, then 128; subsequent runs require the prior successful receipt through --previous-receipt, matching source and image, complete cleanup, available capacity and the declared native latency gate. Each sandbox has both a workload and supervisor container, so these counts are reported separately. Both receive explicit CPU and memory limits; fresh supervisor containers receive restrictive limits only after their exact owned identity is verified. Host capacity reserves remain in force even when a requested wave fits its explicit budget.

The committed fixture is uploaded alone and its bytes are verified remotely. Required proofs bind the exact outer OpenShell command run from the host fixture checkout. A native file lock serializes commands assigned to each sandbox; outer command time includes that wait, CLI/network overhead and remote execution. It does not pretend the remote directory has the host repository identity.

A durable ownership journal records each attempted creation before the RPC and each observed sandbox/container identity afterward. Cleanup uses only matching IDs, run labels and images. An interrupted create with no observed identity remains unresolved even if the current inventory is empty: absence cannot prove that the gateway will not complete the request later. Deadline or interruption stops the owned local process group before the parent reconciles that journal. Failed or uncertain cleanup makes the receipt fail.